Our projects
Projects
RESORT -2 AT CAT CO BEACH, FLAMINGO CAT BA ISLAND RESORT PROJECT
Design and Zoning Review & Basic Design
Read moreMY LAM ONSEN TOWN
Conceptual Master plan design (scale of 1/500) & Architectural Concept Design
Read moreYOKO ONSEN QUANG HANH
Pre-Design, Master Planning, Conceptual Design, Basic Design, Detailed Design
Read moreNORTH-EAST SAPA INFRASTRUCTURE DEVELOPMENT PROJECT
Conceptual Zoning Master Plan (scale of 1/2000), Review Master Plan, Feasibility Study, Detailed Design
Read moreAMATA SMART CITY MONG CAI IN VIETNAM
Conceptual Zoning Master Plan (scale of 1/2000), Planning tasks, Zoning Master Plan(scale of 1/2000).
Read morePHU MY 3 SPECIALIZED INDUSTRIAL PARK, BA RIA VUNG TAU PROVINCE
Master Plan, Detailed Design, Construction Supervision, Advisory Services
Read moreXUAN CAM - HUONG LAM INDUSTRIAL-URBAN- SERVICES AREA, HIEP HOA DISTRICT, BAC GIANG
Master Plan on the scale of 1/2000
Read moreCAI MEP HA LOGISTICS CENTER, BA RIA VUNG TAU PROVINCE
Conceptual Zoning Master Plan (scale of 1/2000), Planning tasks, Zoning Master Plan(scale of 1/2000).
Read moreADB: 3340-VIE URBAN ENVIRONMENT & CLIMATE CHANGE ADAPTATION PROJECT - HOI AN CITY
Contract Management, Review Detailed Design, Construction Supervision
Read moreTA 9417-VIE: INTEGRATING CLIMATE RESILIENCE AND ENVIRONMENT PROTECTION FOR SECONDARY GREEN CITIES DEVELOPMENT PROJECT - DEMONSTRATED SUSTAINABLE AND RESILIENT DEVELOPMENT IN HUE, HA GIANG AND VINH YEN
Technical Assistance
Read moreINFORMATION GATHERING SURVEY ON AGRICULTURAL POLICIES AIMED AT STRENGTHENING THE FOOD VALUE CHAIN IN VIETNAM
Study
Read moreINITIAL ENVIRONMENT EXAMINATION (IEE) SERVICE FOR THE PROJECT ON MANUFACTURING OF AUTOMOBILES AND WHOLESALES OF MANUFACTURED AUTOMOBILES OF SUZUKI THILAWA MOTOR COMPANY LIMITED IN THILAWA SEZ ZONE A IN YANGON, MYANMAR
Initial Environment Examination (IEE) service
Read moreENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT (ESIA) REPORT FOR THE PROJECT ON AN INDUSTRIAL ZONE DEVELOPMENT IN YANGON, MYANMAR
Environmental and Social Impact Assessment (ESIA) service
Read moreRESEARCH, DEVELOPMENT AND PILOT APPLICATION OF ENVIRONMENT MANAGEMENT MODELS INCLUDING SOME MANAGEMENT TOOLS FOR IZS UNDER VIETNAM INDUSTRIAL POLLUTION MANAGEMENT
Study
Read morePOST-RESETTLEMENT SURVEY FOR THANG LONG IP III (2018) AND ADVISORY SERVICES ON SOCIAL CONSIDERATION FOR THANG LONG IP II (2022).
Land Acquisition and Livelihood Restoration Plan (Thang Long IPIII) & Advisory Services on Social Consideration (Thang Long IPII)
Read moreTA 9554-REG: SOUTHEAST ASIA URBAN SERVICES FACILITY (PREPARATION THE SECONDARY CITIES ENVIRONMENT IMPROVEMENT PROJECT)
Technical Assistance
Read moreDATA COLLECTION SURVEY ON FORMULATING BASIC PLAN OF COMPREHENSIVE URBAN INUNDATION COUNTERMEASURES IN VINH CITY
Study
Read moreHONG RIVER SURFACE WATER PLANT PROJECT
Review Feasibility Study & Basic Design, Procurement Assistance
Read moreNHON TRACH WATER SUPPLY PROJECT – STAGE II
Review Feasibility Study & Basic Design, Detailed Design & Cost Estimation and Tender Assistance, Construction Supervision, Training and Technical transfer
Read moreOVERSEA EXPERIENCES IN TRANSPORTATION SECTOR
various services including study, feasibility study, 3D modeling, ect..
Read moreHANOI CITY METRO LINE 2 CONSTRUCTION PROJECT (TRAN HUNG DAO-THUONG DINH SECTION)
Review of Pre-Feasibility Study
Read moreHO CHI MINH CITY METRO LINE 1 CONSTRUCTION PROJECT (BEN THANH-SUOI TIEN SECTION)
General Consulting services, Project Management and Construction Supervision (sub-consultant)
Read moreDATA COLLECTION SURVEY ON DEVELOPMENT OF THE LIEN CHIEU PORT IN DA NANG CITY, VIETNAM
Study
Read moreCONSULTING SERVICES FOR CONSTRUCTION SUPERVISION FOR INVESTMENT AND CONSTRUCTION OF BERTH NO. 5&6 AT LACH HUYEN PORT UNDER HAI PHONG SEA PORT.
Appraisal of Detailed Design and Construction Supervision
Read moreLACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT (PORT) – BERTH NO. 1& 2
Construction supervision
Read moreCONSTRUCTION INVESTMENT PROJECT FOR THE INTERCONNECTING ROAD OF NH91 AND LONG XUYEN CITY BYPASS
Topo-geo Investigation, FS Review, Detailed Design, Procurement Assistance, Construction Supervision
Read moreHANOI CITY RING ROAD NO. 3 CONSTRUCTION PROJECT, MAI DICH – SOUTH THANG LONG SECTION, HANOI CITY
Topo-geo Investigation, Detailed Design, Procurement Assistance
Read moreHOA BINH - MOC CHAU EXPRESSWAY PROJECT (SECTION IN HOA BINH PROVINCE)
Feasibility Study, Basic Design
Read moreHAI VAN PASS ROAD TUNNEL EXPANSION INVESTMENT PROJECT
Feasibility Study, Detailed Design, Cost Estimation
Read moreCU MONG PASS ROAD TUNNEL CONSTRUCTION INVESTMENT PROJECT
Feasibility Study, Detailed Design, Cost Estimation
Read moreADB-TA6843-VIE: UNLOCKING THE POTENTIAL FOR CLIMATE CHANGE AND DISASTER RESILIENCE MULTI-SECTOR PROVINCES– HOA BINH AND LAO CAI CITY
Technical Assistance
Read moreRESTORING AND SUSTAINABLE MANAGEMENT FORESTATION PROJECT (FORESTRY SECTOR PROJECT LOAN)
Project Management
Read moreCONSTRUCTION SUPERVISION (SAFEGUARD MONITORING) FOR SECONDARY GREEN CITIES DEVELOPMENT PROJECT -VY-CS01
Safeguard Monitoring
Read moreHA LONG WATER IMPROVEMENT PROJECT
Review and Update Feasibility Study, Basic Design, Engineering and social survey, Detailed Design & Cost Estimation and Tender Assistance
Read moreRESORT -2 AT CAT CO BEACH, FLAMINGO CAT BA ISLAND RESORT PROJECT
Location | Hai Phong |
Time | 2018 -2019 |
Fund | Private |
Services | Design and Zoning Review & Basic Design |
HH2 APARTMENT BUILDING AT PARCEL A, GAMUDA CITY
Location | Ha Noi |
Time | 2020 - On-going |
Fund | Private |
Services | Landscape Design |
ARIYANA TOURISM COMPLEX
Location | Da Nang |
Time | 2020 |
Fund | Private |
Services | Interior Construction Design, Detailed Interior Design |
HANOI TENNIS CENTER
Location | Ha Noi |
Time | 2018 |
Fund | Private |
Services | Master plan and Concept Design, Pre-feasibility Study |
MY LAM ONSEN TOWN
Location | Tuyen Quang |
Time | 2018 - 2022 |
Fund | Private |
Services | Conceptual Master plan design (scale of 1/500) & Architectural Concept Design |
YOKO ONSEN QUANG HANH
Location | Quang Ninh |
Time | 2017 - 2021 |
Fund | Private |
Services | Pre-Design, Master Planning, Conceptual Design, Basic Design, Detailed Design |
NORTH-EAST SAPA INFRASTRUCTURE DEVELOPMENT PROJECT
Location | Lao Cai |
Time | 2017 - 2023 |
Fund | Private |
Services | Conceptual Zoning Master Plan (scale of 1/2000), Review Master Plan, Feasibility Study, Detailed Design |
AMATA SMART CITY MONG CAI IN VIETNAM
Location | Quang Ninh |
Time | 2021 - On-going |
Fund | Private |
Services | Conceptual Zoning Master Plan (scale of 1/2000), Planning tasks, Zoning Master Plan(scale of 1/2000). |
VAM CONG INDUSTRIAL PARK, AN GIANG PROVINCE
Location | An Giang |
Time | 2019 |
Fund | Private |
Services | Detailed Master Plan (scale of 1/500) |
HOA NINH INDUSTRIAL PARK, DA NANG CITY
Location | Da Nang |
Time | 2021 - 2022 |
Fund | Private |
Services | Conceptual Zoning Master Plan (scale of 1/2000) |
PHU MY 3 SPECIALIZED INDUSTRIAL PARK, BA RIA VUNG TAU PROVINCE
Location | Ba Ria - Vung Tau |
Time | 2014 - 2017 |
Fund | Private |
Services | Master Plan, Detailed Design, Construction Supervision, Advisory Services |
XUAN CAM - HUONG LAM INDUSTRIAL-URBAN- SERVICES AREA, HIEP HOA DISTRICT, BAC GIANG
Location | Bac Giang |
Time | 2019 - 2020 |
Fund | Private |
Services | Master Plan on the scale of 1/2000 |
CAI MEP HA LOGISTICS CENTER, BA RIA VUNG TAU PROVINCE
Location | Ba Ria - Vung Tau |
Time | 2017 - 2020 |
Fund | State budget |
Services | Conceptual Zoning Master Plan (scale of 1/2000), Planning tasks, Zoning Master Plan(scale of 1/2000). |
MINH KHAI URBAN AREA PROJECT
Location | Quang Ninh |
Time | 2020 |
Fund | Private |
Services | Concept regional planning service |
CUA LUC BAY PROJECT, QUANG NINH PROVINCE
Location | Quang Binh |
Time | 2019 - 2020 |
Fund | Private |
Services | Concept Regional Planning |
DEVELOPMENT POLICY OPERATION PROGRAM FOR MEKONG DELTA REGION
Location | Various provinces |
Time | 2021 – On-going |
Fund | ADB, JICA |
Services | Master Plan, Study |
ADB: 3340-VIE URBAN ENVIRONMENT & CLIMATE CHANGE ADAPTATION PROJECT - HOI AN CITY
Location | Quang Nam |
Time | 2019 - 2023 |
Fund | ADB loan |
Services | Contract Management, Review Detailed Design, Construction Supervision |
TA 9417-VIE: INTEGRATING CLIMATE RESILIENCE AND ENVIRONMENT PROTECTION FOR SECONDARY GREEN CITIES DEVELOPMENT PROJECT - DEMONSTRATED SUSTAINABLE AND RESILIENT DEVELOPMENT IN HUE, HA GIANG AND VINH YEN
Location | Ha Giang and Thua Thien-Hue and Vinh Yen |
Time | 2021 - 2023 |
Fund | ADB Grant |
Services | Technical Assistance |
INFORMATION GATHERING SURVEY ON AGRICULTURAL POLICIES AIMED AT STRENGTHENING THE FOOD VALUE CHAIN IN VIETNAM
Location | Various provinces |
Time | 2023 |
Fund | JICA |
Services | Study |
DUE DILIGENCE FOR HYDROPOWER PROJECTS IN VIETNAM
Location | Various provinces |
Time | 2015 - 2016 |
Fund | Private |
Services | Due Diligence |
INITIAL ENVIRONMENT EXAMINATION (IEE) SERVICE FOR THE PROJECT ON MANUFACTURING OF AUTOMOBILES AND WHOLESALES OF MANUFACTURED AUTOMOBILES OF SUZUKI THILAWA MOTOR COMPANY LIMITED IN THILAWA SEZ ZONE A IN YANGON, MYANMAR
Location | Overseas |
Time | 2020 - 2021 |
Fund | Private |
Services | Initial Environment Examination (IEE) service |
ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT (ESIA) REPORT FOR THE PROJECT ON AN INDUSTRIAL ZONE DEVELOPMENT IN YANGON, MYANMAR
Location | Overseas |
Time | 2019 - 2021 |
Fund | Private |
Services | Environmental and Social Impact Assessment (ESIA) service |
SURVEY ON CIRCULAR ECONOMY IN VIETNAM IN 2022
Location | Ha Noi |
Time | 2022 |
Fund | JICA |
Services | Survey |
GREEN GROWTH HA LONG BAY
Location | Quang Ninh |
Time | 2018 - 2019 |
Fund | JICA |
Services | Study |
INITIAL ENVIRONMENTAL INVESTIGATION AT XUAN DAI BAY, PHU YEN PROVINCE
Location | Phu Yen |
Time | 2020 |
Fund | JICA |
Services | Study |
RESEARCH, DEVELOPMENT AND PILOT APPLICATION OF ENVIRONMENT MANAGEMENT MODELS INCLUDING SOME MANAGEMENT TOOLS FOR IZS UNDER VIETNAM INDUSTRIAL POLLUTION MANAGEMENT
Location | Various provinces |
Time | 2017-2018 |
Fund | World Bank |
Services | Study |
POST-RESETTLEMENT SURVEY FOR THANG LONG IP III (2018) AND ADVISORY SERVICES ON SOCIAL CONSIDERATION FOR THANG LONG IP II (2022).
Location | Hung Yen and Vinh Phuc |
Time | 2018 & 2022 |
Fund | Private |
Services | Land Acquisition and Livelihood Restoration Plan (Thang Long IPIII) & Advisory Services on Social Consideration (Thang Long IPII) |
TA 9554-REG: SOUTHEAST ASIA URBAN SERVICES FACILITY (PREPARATION THE SECONDARY CITIES ENVIRONMENT IMPROVEMENT PROJECT)
Location | Binh Thuan and Dak Nong |
Time | 2022 |
Fund | ADB |
Services | Technical Assistance |
DATA COLLECTION SURVEY ON FORMULATING BASIC PLAN OF COMPREHENSIVE URBAN INUNDATION COUNTERMEASURES IN VINH CITY
Location | Nghe An |
Time | 2020 - 2021 |
Fund | JICA |
Services | Study |
ADJUSTMENT OF KHANH HOA SOLID WASTE MANAGEMENT MASTER PLAN PROJECT
Location | Khanh Hoa |
Time | 2018 - 2019 |
Fund | Government of Vietnam |
Services | Master plan |
HONG RIVER SURFACE WATER PLANT PROJECT
Location | Ha Noi |
Time | 2016 - 2017 |
Fund | Private |
Services | Review Feasibility Study & Basic Design, Procurement Assistance |
NHON TRACH WATER SUPPLY PROJECT – STAGE II
Location | Dong Nai |
Time | 2016 – On-going |
Fund | JICA ODA loan |
Services | Review Feasibility Study & Basic Design, Detailed Design & Cost Estimation and Tender Assistance, Construction Supervision, Training and Technical transfer |
TOYOTA NEW TEST ROAD CONSTRUCTION PROJECT, VINH PHUC PROVINCE
Location | Nhiều tỉnh thành |
Time | 2018 - 2019 |
Fund | Private |
Services | Thietes ke gif |
OVERSEA EXPERIENCES IN TRANSPORTATION SECTOR
Time | 2016 - on-going |
Fund | Various sources |
Services | various services including study, feasibility study, 3D modeling, ect.. |
HANOI CITY METRO LINE 2 CONSTRUCTION PROJECT (TRAN HUNG DAO-THUONG DINH SECTION)
Location | Ha Noi |
Time | 2018 - 2019 |
Fund | Private |
Services | Review of Pre-Feasibility Study |
HO CHI MINH CITY METRO LINE 1 CONSTRUCTION PROJECT (BEN THANH-SUOI TIEN SECTION)
Location | Ho Chi Minh |
Time | 2013 – On-going |
Fund | JICA ODA loan |
Services | General Consulting services, Project Management and Construction Supervision (sub-consultant) |
DATA COLLECTION SURVEY ON DEVELOPMENT OF THE LIEN CHIEU PORT IN DA NANG CITY, VIETNAM
Location | Da Nang |
Time | 2020 - 2021 |
Fund | JICA |
Services | Study |
CONSULTING SERVICES FOR CONSTRUCTION SUPERVISION FOR INVESTMENT AND CONSTRUCTION OF BERTH NO. 5&6 AT LACH HUYEN PORT UNDER HAI PHONG SEA PORT.
Location | Hai Phong |
Time | 2022 - 2024 |
Fund | Private |
Services | Appraisal of Detailed Design and Construction Supervision |
LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT (PORT) – BERTH NO. 1& 2
Location | Hai Phong |
Time | 2013 - 2020 |
Fund | JICA ODA Loan |
Services | Construction supervision |
LONG THANH INTERNATIONAL AIRPORT
Location | Dong Nai |
Time | 2018 - 2022 |
Fund | Government of Vietnam |
Services | Feasibility Study, Detailed Design (sub-consultant) |
CONSTRUCTION INVESTMENT PROJECT FOR THE INTERCONNECTING ROAD OF NH91 AND LONG XUYEN CITY BYPASS
Location | An Giang |
Time | 2021 - 2024 |
Fund | ADB Loan |
Services | Topo-geo Investigation, FS Review, Detailed Design, Procurement Assistance, Construction Supervision |
HANOI CITY RING ROAD NO. 3 CONSTRUCTION PROJECT, MAI DICH – SOUTH THANG LONG SECTION, HANOI CITY
Location | Ha Noi |
Time | 2015 - 2016 |
Fund | JICA ODA Loan |
Services | Topo-geo Investigation, Detailed Design, Procurement Assistance |
HOA BINH - MOC CHAU EXPRESSWAY PROJECT (SECTION IN HOA BINH PROVINCE)
Location | Hoa Binh and Son La |
Time | 2022-2023 |
Fund | State Budget |
Services | Feasibility Study, Basic Design |
HAI VAN PASS ROAD TUNNEL EXPANSION INVESTMENT PROJECT
Location | Da Nang and Thua Thien-Hue |
Time | 2015 - 2020 |
Fund | Private/ BOT scheme |
Services | Feasibility Study, Detailed Design, Cost Estimation |
CU MONG PASS ROAD TUNNEL CONSTRUCTION INVESTMENT PROJECT
Location | Binh Dinh and Phu Yen |
Time | 2015 - 2019 |
Fund | Private/ BOT scheme |
Services | Feasibility Study, Detailed Design, Cost Estimation |
ADB-TA6843-VIE: UNLOCKING THE POTENTIAL FOR CLIMATE CHANGE AND DISASTER RESILIENCE MULTI-SECTOR PROVINCES– HOA BINH AND LAO CAI CITY
Location | Hoa Binh and Lao Cai |
Time | 2022 - On-going |
Fund | ADB Grant |
Services | Technical Assistance |
RESTORING AND SUSTAINABLE MANAGEMENT FORESTATION PROJECT (FORESTRY SECTOR PROJECT LOAN)
Location | Various provinces |
Time | 2013 - 2019 |
Fund | JICA |
Services | Project Management |
DA NHIM HYDROPOWER PLANT EXPANSION PROJECT LAM DONG PROVINCE
Location | Lam Dong |
Time | 2016 - 2021 |
Fund | JICA |
Services | Construction Supervision |
CONSTRUCTION SUPERVISION (SAFEGUARD MONITORING) FOR SECONDARY GREEN CITIES DEVELOPMENT PROJECT -VY-CS01
Location | Vinh Phuc |
Time | 2021 - 2025 |
Fund | ADB loan |
Services | Safeguard Monitoring |
HA LONG WATER IMPROVEMENT PROJECT
Location | Quang Ninh |
Time | 2017 – On-going |
Fund | JICA ODA |
Services | Review and Update Feasibility Study, Basic Design, Engineering and social survey, Detailed Design & Cost Estimation and Tender Assistance |
DONG HA URBAN MASTER PLAN PREPARATION
Location | Quang Tri |
Time | 2017 - On-going |
Fund | ADB loan |
Services | Topographic & social Survey, Master plan Preparation |
DEO CA TUNNEL PROJECT
Location | Khanh Hoa and Phu Yen |
Time | 2013 - 2017 |
Fund | Private/ BOT scheme |
Services | Detailed Design, Construction Supervision |