NHON TRACH WATER SUPPLY PROJECT – STAGE II
Location | Dong Nai |
Time | 2016 – On-going |
Fund | JICA ODA loan |
Services | Review Feasibility Study & Basic Design, Detailed Design & Cost Estimation and Tender Assistance, Construction Supervision, Training and Technical transfer |
Nhon Trach water supply project – stage 2 aims to expand the capacity of clean water delivery along NH51 and Dong Nai Province and contribute to the province’s sustainable socio-economic development. The project constructs a water treatment plant with a production capacity of 100,000m3/day and transmission and distribution networks of about 90 km long with large pipeline diameter ranged of DCI DN800, DCI-DN900,
DCI-DN1000 to supply safe and water to industrial zones, export processing zones, residential areas along NH51 including Bien Hoa City, Long Thanh and Nhon Trach Districts of Dong Nai Province.