LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT (PORT) – BERTH NO. 1& 2
Location | Hai Phong |
Time | 2013 - 2020 |
Fund | JICA ODA Loan |
Services | Construction supervision |
Lach Huyen International Port is the largest deep-sea port with 9 berths in the Northern region. NKV as a member of the JV Consultant has successfully completed construction supervision services for the Berth 1&2 financed by JICA ODA loan. The Berth 1&2 comprises 02 deep-sea container terminals having a capacity of accommodating 100,000DWT. The project components include reclamation and soil improvement for the container terminal (water depth: -14.0 m, berth length: 750 m, two berths), access channel, training dyke/sand protection dike, revetment, port service road, and service berth.