HONG RIVER SURFACE WATER PLANT PROJECT
Location | Ha Noi |
Time | 2016 - 2017 |
Fund | Private |
Services | Review Feasibility Study & Basic Design, Procurement Assistance |
Hong River Surface Water Treatment Plant has a capacity of 300,000 m3/day by 2020, 450,000 m3/day by 2030 and 600,000 m3/day by 2050. Stage 1 of the project will reach a capacity of 300,000 m3/day as one of the large-scale water treatment plants in Northern Vietnam, divided into 02 phases with a total of 150,000 m3/day.
The 2 phases consist of the construction of intake, raw water pipeline and treated water pipeline. NKV rendered the consulting services for review feasibility study and procurement assistance for the Stage 1.